Event · AV · inventory

Event equipment & AV fleet tracking

I build event equipment tracking — AV and rigging fleet, kits, serials, on-site/in-case statuses, return QC. Royal Rental experience: quotes, logistics, damage. MVP in 10–15 days. Fullstack Vladislav Kompaniec — 130+ projects.

from 130,000 ₽ / project

10–15 days. CRM/WMS bundle optional.

Get in touch

Why event equipment tracking

Excel loses serials during touring season. Know where every case is before show day.

Show-ready

Free on event date — before quote conflict.

Case tracking

Flight case units — partial missing alerts.

Royal Rental

Rigging prep checklists from shows.

Tour history

Wear, venue history.

Maintenance

Repair flags, downtime.

130+ projects

Vladislav Kompaniec — event + software.

Event equipment tracking

AV/light/rigging park — location, condition, assignment.

Spreadsheets fail at «where is grandMA». System in 10–15 days: inventory, serial, kits, project assign, QC.

Royal Rental: prep, load list, return, damage.

Owned + subrent visibility; shared school pools.

One serial across CRM and WMS.

Tracking modules

10–15 day MVP — fleet, kits, statuses, QC.

Asset registry

Serial, category, warranty.

Kits & cases

Bundles, case labels.

Calendar

Conflict view.

Prep checklist

Pre-show sign-off.

Issue/return

Scan, condition.

On-site

Truck, venue, rig.

Maintenance

Repair tickets.

Reports

Utilization, damage.

Who it's for

Event/AV where gear is revenue asset.

AV rental

Royal Rental.

Production

Own pool.

Touring

Cases.

Install

Mixed pool.

Education AV

Shared.

Corporate

In-house.

What we need

10–15 days, from 130,000 ₽.

  1. Fleet

    Units, kits.

  2. Workflow

    Prep → return.

  3. Scan

    Barcode need.

  4. CRM

    Project link.

  5. Users

    WH, TD.

  6. Royal ref

    Modules?

Technical aspects

Reliability, security, and scale built in from day one.

Performance

DB indexes, cache, and queues keep the system fast as data and users grow. Load testing on staging before production.

Security

HTTPS, role-based access, audit logs, and API key protection. Personal data handled per your compliance model.

API & webhooks

REST and webhooks for website, 1C, Telegram, and partners — no manual re-entry. API docs included.

Mobile web

Responsive layout and PWA — most users work from phones. Native iOS/Android apps when needed.

Backups

Automated DB and file backups with verified restore on staging. Data loss in normal ops is unacceptable.

Staging

Test environment for team training and integration checks before release. Updates roll out without blocking core ops.

How we build it

  1. 01

    Brief & scope

    Scenarios, roles, integrations — MVP and estimate in 1–2 calls. We lock v1 priorities and what moves to phase two.

  2. 02

    Prototype

    Wireframes for key screens and admin — revisions before build. UX flows agreed so logic isn't rebuilt mid-project.

  3. 03

    MVP

    Working flow on your domain: core modules and test data. Your team walks through scenarios on staging before live integrations.

  4. 04

    Integrations

    Payments, 1C, Telegram, partner APIs — verified on staging. Test payments, doc exchange, and webhooks before go-live.

  5. 05

    Launch

    Deploy, team onboarding, monitoring first operations. Handover of access, docs, and support for first iterations.

Rental & events

Royal Rental

Royal Rental provides equipment rental and event production support. Quotes, logistics, gear booking, and rigging statuses — experience I bring into CRM/WMS and event inventory systems.

FAQ

Cost?

From 130,000 ₽. 10–15 days.

vs WMS?

Event-focused lighter.

Royal Rental?

Ops-derived.

Mobile?

Often MVP.

CRM?

Bundle possible.

Order equipment tracking

Fleet and show flow — from 130,000 ₽, 10–15 days.